After receiving the sales order from the salesperson, the customer needs to submit it to the corresponding customer service according to the required size.
Material selection
Material selection
According to the actual situation of your home and the practicability of various materials, you can refer to the product introduction of the product center.
Design scheme
Design scheme
At this stage, we should actively communicate with the engineer and introduce the project in detail as much as possible and some life preferences of users in each room, so that the designer can design a more perfect scheme for selection.
Production stage
Production stage
At this time, the design drawings are in the hands of the technical workers of the factory, and the production can be started if there is no objection to the disassembly and analysis. The whole production cycle takes about 15 days, depending on the manufacturing process proficiency of the processing plant.
Construction stage
Construction stage
Installation diagram, packaging scheme, parts processing process flow chart and product operation manual. The main contents in the parts processing flow sheet shall cover the name, specification, quantity, materials, batch and processing precautions.
Check before acceptance
Check before acceptance
Acceptance stage. Be careful during acceptance, mainly to see whether the surface paint film has wrinkles, bubbles, falling off and other defects, and whether the connection between home components is reasonable and firm.